Taking off is not a favourite task that all of the QS are willing to deal with. Even after 5 years of experience in QS, I still found it difficult for me to make all thing correctly without a missing item. Here is some notes that I hope can help the QS and myself in preparing their taking off measurement. 



Taking off step:


  1. Study the drawing basic information. What is the type of building? Where is the location? How many quantities? What is the measurement boundaries?
  2. Identify the project simple particular, basically you can get from the general note on drawings. Concrete grade? Concrete cover etc.
  3. Identify the project detail particular from drawings. Configure as much as you can from the drawings. Divided the particular based on the element to ease your measurement afterward.
  4. Prepare your taking off sheet based on the basic information you already configure before.
  5. Prepare the element sum on your taking off sheet stating the detail particular your already noted on the item 2 and 3.
  6. Start your measurement. Adviseable to start with the simple element then move to the hardest one. You might effect your mood and spirit if you get stuck on the the hard element during the taking off process. Simple elements are item that unit used is nos. They are like door and windows, sanitary fittings, and loose furniture.
  7. Please take note that architecture elements are simple to measure but they are many items to cover. Here, experience in construction will help you a lot in minimize your missing item. Do have some discussion with your colleague or have a checker for your quantity. 
  8. Structural elements are complicated to measure but it is only a few and common items involved such as concrete, formwork and rebar. Please take note, that structural items do need a longer duration. Don't get upset and frustrated if you use the whole day or maybe 2 or 3 days for the beam only. Experience in measurement are important to assure you take off correctly. The mistake in this elements would give a high impact on the project cost especially with the rebar. Double check on your rebar size and the formula in your excel taking off sheet.
  9. And most of the important is Enjoy your taking off process :) you know  your body limit and do have a good rest for the next day. Manage your measurement start from the assign project start.
Good luck! :D